The Sixth Branch: Hpmont (Thailand) Co., Ltd. Is Officially Founded!
On January 26th, HPMONT (Thailand) Co., Ltd. and Thailand Elevator Modernization Service Center was officially founded! It is HPMONT's sixth overseas branch, marking another important milestone in our globalization strategy and a key step to broaden and root in the Southeast Asian market.
HPMONT invited a number of domestic partners to Thailand to witness the grand opening with overseas partners, deepening global cooperation.
Thailand service team▼
Thailand
▼Before modernization
▼After modernization
Project name | Royal Thai Army HQ |
Building height | 5 floors |
Number | 4 units |
Speed and load capacity | 1m/s 900kg |
Original elevator brand | Mitsubishi |
Configuration | MTCC-Y2 Series Control Panel+Emergency rescue |
Architectural history | Built in 1874. The Mitsubishi motor elevator has been running for 30 years. In December 2022, HPMONT modernized it, which is the first application of HPMONT elevator modernization solution in Thailand |
Thailand
▼Comparison before and after modernization
Project name | Nanmeebook Building |
Building height | 4 floors |
Number | 1 |
Speed and load capacity | 0.5m/s 1600kg |
Passenger capacity | 21 units |
Original elevator brand | KONE |
Configuration | MTCC-V3L Series Control Panel with emergency power and KONE special accessory kit for modernization |
Architectural history | Founded in 2007. The KONE motor elevator has been running for 15 years. In August 2023, HPMONT modernized it. |
Thailand
Project name | PCG food factory |
Building height | 4 floors |
Number | 4 units |
Speed and load capacity | 1m/s 2000kg |
Configuration | MTCC-Y3/W3 Series Control Panel |
Architectural history | Serving the factory of Thailand's top food manufacturer. Solutions with high tonnage, high power, dual internal and hall call, and precise control of opposite doors. |
New Global Elevator Project Cases (Since July 2023)
Korea Gwangmyeong
Project name | GIDC(landmark building) |
Building height | 26-29 floors |
Number | 3 units |
Speed and load capacity | 1.5m/s 5000kg |
Configuration | MT70 Integrated Controller (75kw) Solution for carge elevator with up-down opening door in Korea |
Malaysia - Sabah
Project name | Multi-functional integrated shopping areas (22 applications) |
Building height and number of elevators | 9 units, 18 floors 7 units, 16 floors 6 units, 12 floors |
Speed and load capacity | 2.5m/s 1155kg 2.5m/s 1360kg 2m/s 1360kg 3.5m/s 1360kg |
Original elevator brand | Mitsubishi |
Configuration | MTCC-Y3&MTCC-Y4 Series Control Panel Group control Emergency rescue Rope gripper Arrival light |
Malaysia - Johor Bahru
Project name | JB Hotel (14 applications) |
Building height and number of elevators | 4 units, 29 floors 4 units, 30 floors 4 units, 28 floors 2 units, 9 floors |
Speed and load capacity | 2.5m/s 1025kg 1.75m/s 1635kg 2.5m/s 1025kg 1m/s 1500kg |
Original elevator brand | SIGMA |
Configuration | MTCC-Y3 Series Control Panel with group control Community elevator monitoring system |
Singapore
Project name | Ngee Ann City Mall (Escalator Application) |
Number | 74 units |
Original elevator brand | Hitachi |
Configuration | MTCC-E1 Series Escalator Control Panel with PLC monitoring system |
Architectural history | One of the largest commercial shopping malls in Singapore, it is a shopping center landmark on Orchard Road, with a total of 7 floors and more than 100 internationally renowned brand stores. |
Liaoning - Dalian
Project name | A special inspection group (government unit) |
Building height | 5 floors |
Number | 6 units |
Speed and load capacity | 1m/s 1000kg |
Original elevator brand | Mitsubishi, Hitachi, Attenborough |
Configuration | MTCC-W Series Control Panel |
Liaoning - Dandong
Project name | Office building of a power plant (government unit) |
Building height | 11 floors |
Number | 4 units |
Speed and load capacity | 1.75m/s 1000kg |
Configuration | MTCC-V3-B Series Control Panel |
Guangdong-Foshan
Project name | Shenzhen, China |
Building height | 8 floors |
Number | 46 units |
Speed and load capacity | 1m/s 5000kg |
Configuration | MT70 Integrated Controller(55kw) |